How to get a wooded lot ready for a new home

You own the lot and you cannot see into it. This is what to settle before any machine shows up, the order the work goes in, and what it costs around here.

9 minute readChecked

See a price range for your land

After: a lot cut back to open mowed ground running to the tree line, the mature trees left standing.

The short version

  • Paper comes before machines: staked corners, a site plan, the septic spot and one call to the county.
  • On a Florida lot, any work within 25 feet of a gopher tortoise burrow counts as a disturbance. Walk it and look first.
  • Stumps only have to come out where you build, drive and bury pipe. The rest can be mulched or left as woods.
  • One acre of brush and small trees, stumps out and rough graded, is an estimated $4,400 to $7,150. Our job minimum is $2,000.
  • Four mistakes cost money later: clearing too much, burying debris under the pad, trenching through the roots of a keeper and skipping drainage.

You bought the lot for the trees. Now the trees hide the corners, the slope and the spot where the house should sit. The first thing that ground needs is not a machine.

It needs a few pieces of paper and one slow walk. Clearing is fast, and it cannot be undone. This is the order of the job on a lot in North Florida or South Georgia.

Before any machine shows up

  1. Get the corners staked

    A surveyor finds the corner pins and flags the lines. We clear to stakes, not to a fence somebody remembers. If the brush is too thick to walk, we can mulch a path along the line first.

  2. Get the site plan from your builder

    It shows the house, the driveway and the setbacks. Ask the builder to stake the house corners and to say how much working room the slab crew wants. The opening has to be bigger than the house.

  3. Put the septic and the well on paper

    The septic spot is picked by the soil, not by where you would like it. Get it drawn before clearing, so we know which ground to open and which to keep trucks off. The EPA says not to park or drive on a drain field.

    Septic and well: permitted first, by licensed tradesIn Gadsden, Leon, Jackson and Jefferson counties, the Florida Department of Environmental Protection issues septic permits itself.

    The application takes a site plan and a site evaluation of the soil. Georgia goes further. Its rule bars the physical development of a lot that will use a septic system until the County Health Department issues the construction permit. Check with that office whether clearing counts. In the Northwest Florida Water Management District, only a licensed water well contractor can apply for a well permit.

    Sources

  4. Call the permit desk

    Call the county planning office, or City Hall inside city limits. Ask three things. Does clearing for one house need a permit here? Does the driveway? What must be in hand before the building permit?

    The answer changes at every county lineGadsden County's tree protection section exempts placing one detached single family house on a lot.

    The county also has a Tree Removal and Clearing Permit application with a $100 fee. Check with the Planning Division which applies. Leon County requires an environmental management permit for tree removal and stormwater projects. Tallahassee wants an Environmental Management Permit or a waiver before it issues building permits. Jefferson County wants a Development Permit before any building permit. Inside Valdosta, land disturbing work needs a city permit unless the city's erosion rules exempt it. The application names clearing and grubbing.

    Who to check with before you clear
    Where the lot isOfficePhone
    Gadsden County, outside city limitsPlanning Division(850) 875-⁠8663
    Leon County, outside TallahasseeDevelopment Support and Environmental Management(850) 606-⁠1300
    City of TallahasseeGrowth Management(850) 891-⁠7001
    Jefferson CountyPlanning Department(850) 342-⁠0223
    City of ValdostaEngineering Department(229) 242-⁠2600
    Bainbridge and Decatur CountyBuilding Department and Planning(229) 248-⁠2000

    Who to check with before you clear

    Read from each office's own page on November 11, 2026. Inside Quincy, Marianna or Monticello, call City Hall.

  5. Walk it for burrows and wet ground

    Two things can move a house: a gopher tortoise burrow on a Florida lot, and low ground that holds water. Find both while the house is still a drawing.

    Gopher tortoise burrows (Florida)Gopher tortoises and their burrows are protected by state law.

    Any work within 25 feet of a burrow counts as a disturbance, parked equipment included. Stay 25 feet back from every burrow and you may not need a permit. Closer than that, a relocation permit from the Florida Fish and Wildlife Conservation Commission comes first. We do not move tortoises.

    Source

    Low ground that holds water (Florida)Environmental Resource Permits cover dredging and filling in wetlands.

    In the Panhandle that includes isolated wetlands. Nobody on a machine can rule a wet spot in or out. Check with the Northwest Florida Water Management District at (850) 951-⁠4660 before that ground is touched.

    Sources

  6. Line up the utility locates

    We request utility locates before we dig. Show me anything a past owner buried: a well line, a septic tank, a yard light.

    Locates before the first bucket of dirtFlorida law requires notice through 811 at least 2 full business days before any excavation.

    Georgia 811 says at least 3 business days. Sunshine 811 says private utilities belong to the property owner and are not located when you contact 811.

Decide what stays before you decide what goes

Where the house sits decides which trees live. So pick the keepers before the footprint is final. Tie a ribbon on every tree you would hate to lose. I walk the lot with you before anything is cut, and the keepers get flagged.

A keeper needs its roots left alone. UF/IFAS says protection should reach the drip line, the outer edge of the branches. It warns that raising or lowering the soil around a tree by even a few centimeters can kill it.

Gadsden County puts a number on the circleFor protected trees on development sites, the county code sets the zone at one foot of radius for every inch of trunk diameter.

A 24 inch oak gets 24 feet in every direction. No heavy machinery may work or park inside the barrier, and no fill may go there. Underground utilities stay at least 10 feet away. A single house lot is exempt, but the distances are a sound measure.

Everything in the footprint, on the driveway line, over the septic area and along the trench lines has to go. Everywhere else, brush can be mulched where it stands with the John Deere 335P and its MK76 head. The roots and the topsoil stay put. We do not promise that any tree lives through construction. We keep machines, fill and piles out of its circle.

The order of the work

  1. Open the way in

    We start at the road, on the line of your future driveway. UF/IFAS reports that over 90 percent of soil compaction happens in the first three tire passes, so the machines keep to one route.

  2. Take down anything old

    An old trailer, shed or house comes out first, with the John Deere 60P excavator and its hydraulic thumb. See demolition.

  3. Clear inside the marks

    Trees inside the flags come down, and brush outside the footprint is mulched, not dug. That is lot clearing.

  4. Dig the stumps where you build

    The 60P digs each stump and its main roots out of the footprint, the drive and the septic area. The 335P carries them off in the Blue Diamond root grapple.

  5. Settle the pile

    Debris can stay piled on your land, be burned under the state rules, or be hauled off by the load.

  6. Rough grade, then the pad

    Stump holes are filled, ruts are smoothed, and the pad is shaped on the soil that is there, above the ground around it. Laser finishing and compaction tests belong to your builder's other trades. See site preparation.

  7. Drive and culvert last

    The drive is shaped, and a pipe goes in where it crosses the road ditch. Check with the road office before anyone buys pipe.

An old building on the lotFlorida law requires a building permit to demolish any building.

Check with your county building department about who pulls it. Florida bars burning treated lumber, plastics and rubber. Georgia bars burning man made materials such as shingles and lumber. So a torn down trailer is hauled, never burned.

Sources

Burning the pileIn Florida, every land clearing pile burn needs an authorization from the Florida Forest Service.

On a home site the pile must sit 300 feet from any occupied building other than the owner's. In Georgia, burning debris piled by machine means contacting the Georgia Forestry Commission first. The state rule there is 1,000 feet from any occupied structure unless the state approves less.

Sources

Where the drive meets the roadOn a Florida state highway, no connection may be built or substantially altered without an access permit from the Department of Transportation first.

Gadsden County's Driveway Connection Permit form lists a $35 fee and an 18 inch culvert, at least 24 feet long, for a residential drive. The pipe goes bigger where the pipes up and down the ditch are bigger. Other counties set their own sizes, so check with the county road or planning office.

What clearing a house lot costs here

Price follows the ground we open, not the size of the deed. It also turns on what grows there and whether the stumps come out.

Estimated ranges, flat and dry ground near Quincy
The jobEstimated range
Half acre of brush and small trees, mulched, roots left in the ground$2,000 to $2,500
Half acre of brush and small trees, stumps out, rough graded$2,850 to $4,650
One acre of brush and small trees, stumps out, rough graded$4,400 to $7,150
The same acre with a house pad up to 2,500 square feet$7,000 to $12,050
A single wide mobile home torn down and hauled off$2,800 to $5,400

Estimates, not quotes, with the debris piled on the lot. I confirm every price after I walk it. Heavy woods are priced on site. Job minimum: $2,000.

Hauling the pile away adds about $400 to $750 a load. Equipment delivery is free within about 30 road miles of Quincy. Fill dirt, the culvert and the drive are priced on site. The cost guide has the rest.

How long it takes

Start the paperwork first. Some of it runs on a clock set by law. County and city permits take as long as that office takes.

Utility locates
At least 2 full business days in Florida, 3 in Georgia
Georgia septic permit
Up to twenty daysWhat the County Board of Health has to approve or deny a completed application.
The clearing itself
Counted in machine daysI give you a day count after the walk.

Four mistakes that cost money later

Clearing too much

This is the one you cannot fix. Half an acre with the stumps out is an estimated $2,850 to $4,650. A full acre is $4,400 to $7,150. Do not pay the difference to cut down shade you will want back.

One acre of bare dirt is a line in both statesIn Florida, construction that disturbs one acre or more needs coverage under the state stormwater permit when it drains to surface waters or a city storm sewer.

So does a smaller lot inside a larger common plan. The notice is due at least 2 calendar days before work starts, and the fee for 1 to 5 acres is $250. Georgia's erosion law exempts building a single family home that disturbs less than one acre and is not part of a larger plan of one acre or more. That work must still meet the law's minimum requirements, and a city or county may add its own rules.

Sources

Burying debris under the pad

A stump pushed into a hole and covered looks finished. It is still wood under your house. Stumps and roots go to the pile or the truck, never into the fill.

Florida code: no stumps or roots under the houseThe Florida Building Code, Residential (Section R318.6.2) covers the foundation and the ground within 1 foot of it.

All vegetation, stumps, dead roots and trash must come out. The fill must be free of vegetation and compacted. The rule sits in the part of the code on termite protection.

Cutting the roots of a tree you meant to keep

Clearing is not the only risk. A trench for the water line or the power can do it too. UF/IFAS says not to run utilities through a protected area. Mark the trench lines at the same walk as the trees.

Skipping drainage

Clearing changes where the water runs. See which way the lot drains before anything is cut, and keep that path open in the rough grade. The EPA says to keep roof drains and other rainwater away from the drain field.

Florida code: the dirt falls away from the houseThe Florida Building Code, Residential (Section R401.3) says lots shall be graded to drain surface water away from foundation walls.

The grade must fall at least 6 inches within the first 10 feet. Where that is not possible, drains or swales must carry the water off. In Georgia, check with your builder.

Source

Questions

Should I clear the lot before or after the survey?

After. We clear to the surveyor's stakes. If you have no builder yet, start small: have the underbrush mulched so you, the surveyor and a builder can walk the lot. Leave the stumps and the big clearing until the house is placed.

Which stumps have to come out on a house lot?

No. They come out where you pour concrete, drive or bury pipe. In the rest of the yard the mulching head works at ground level and the roots stay in the ground. That costs less, and the roots of the trees you keep are not dug up.

Who gets the permits?

Permits for the house and the septic are yours or your builder's. We tell you which office to call, and we request the utility locates before we dig.

Sources

35 sources

Rules change. Every link below was read between November 11 and November 12, 2026. Check with the office named before you act on it.

  1. Onsite Sewage FAQ: Permitting (last modified September 24, 2026) (opens in a new tab). Florida Department of Environmental Protection. Checked .

  2. Rule 511-3-1-.03: General Requirements for On-Site Sewage Management Systems (opens in a new tab). Rules and Regulations of the State of Georgia, Georgia Secretary of State. Checked .

  3. Well Permits: Frequently Asked Questions (opens in a new tab). Northwest Florida Water Management District. Checked .

  4. How to Care for Your Septic System (opens in a new tab). U.S. Environmental Protection Agency. Checked .

  5. Gadsden County Land Development Code, Chapter 5, Subsection 5404 (version dated December 19, 2023) (opens in a new tab). Gadsden County, Florida. Checked .

  6. Tree Removal and Clearing Permit Application (revised October 20, 2020) (opens in a new tab). Gadsden County Planning Division. Checked .

  7. Driveway Connection Permit application (revised October 20, 2020) (opens in a new tab). Gadsden County Planning Division. Checked .

  8. Environmental Permits (opens in a new tab). Leon County Government. Checked .

  9. Development Support and Environmental Management: Environmental Services (opens in a new tab). Leon County Government. Checked .

  10. Environmental Management Permit (opens in a new tab). City of Tallahassee, Growth Management. Checked .

  11. Tree Permit (opens in a new tab). City of Tallahassee, Growth Management. Checked .

  12. Planning, Zoning and Land Use (opens in a new tab). Jefferson County, Florida. Checked .

  13. Land Development Regulations, Chapter 302, Article 5: Development Permits (Section 302-44) (opens in a new tab). City of Valdosta, Georgia. Checked .

  14. Land Disturbance Permit Application (February 2024) (opens in a new tab). City of Valdosta Engineering Department. Checked .

  15. Arbor Division (opens in a new tab). City of Valdosta, Georgia. Checked .

  16. Planning Department (opens in a new tab). Decatur County, Georgia. Checked .

  17. Gopher Tortoise Permits (opens in a new tab). Florida Fish and Wildlife Conservation Commission. Checked .

  18. Environmental Resource Permitting (opens in a new tab). Florida Department of Environmental Protection. Checked .

  19. Environmental Resource Permits (opens in a new tab). Northwest Florida Water Management District. Checked .

  20. Florida Statutes, Section 556.105: Procedures (Underground Facility Damage Prevention and Safety Act) (opens in a new tab). The Florida Legislature, Online Sunshine. Checked .

  21. The 811 Process (opens in a new tab). Georgia 811. Checked .

  22. Private Utility Locators (opens in a new tab). Sunshine 811. Checked .

  23. Protecting Trees During Construction (opens in a new tab). UF/IFAS Gardening Solutions, University of Florida. Checked .

  24. Conservation Subdivision: Construction Phase: Protecting Trees and Conserved Natural Areas (WEC278/UW323) (opens in a new tab). UF/IFAS Extension, University of Florida. Checked .

  25. Florida Statutes, Section 553.79: Permits; applications; issuance; inspections (opens in a new tab). The Florida Legislature, Online Sunshine. Checked .

  26. Burn Authorizations (opens in a new tab). Florida Department of Agriculture and Consumer Services, Florida Forest Service. Checked .

  27. Know the Law: Land Clearing Debris Burns (opens in a new tab). Florida Department of Agriculture and Consumer Services, Florida Forest Service. Checked .

  28. Burn Permits and Notifications (opens in a new tab). Georgia Forestry Commission. Checked .

  29. Open Burning Rules for Georgia (opens in a new tab). Georgia Environmental Protection Division. Checked .

  30. Open Burning Rules for Georgia: Burn Types (opens in a new tab). Georgia Environmental Protection Division. Checked .

  31. Florida Statutes, Section 335.1825: Access permit required (opens in a new tab). The Florida Legislature, Online Sunshine. Checked .

  32. Construction Activity: NPDES Stormwater Construction Generic Permit (opens in a new tab). Florida Department of Environmental Protection. Checked .

  33. Official Code of Georgia, Section 12-7-17: Exemptions (Erosion and Sedimentation Act of 1975) (opens in a new tab). State of Georgia, public copy of the code linked from the Georgia Secretary of State rules site. Checked .

  34. Florida Building Code, Residential, 8th Edition (2023), Section R318.6: Preparation of building site and removal of debris (opens in a new tab). Florida Building Commission, published by the International Code Council. Checked .

  35. Florida Building Code, Residential, 8th Edition (2023), Section R401.3: Drainage (opens in a new tab). Florida Building Commission, published by the International Code Council. Checked .