Milledgeville is 219 miles out. Here is when we come.
A Lake Sinclair lot where you cannot see the water, or a red clay hillside where the house is going. Our yard is in Quincy, Florida, so I take the bigger jobs here by arrangement.
- From Quincy
- 219 road miles
- The drive, about
- 4 hr 45 min
- County
- Baldwin
- Jobs here
- By arrangement

Aerial: USGS NAIP, flown October 2023
Red clay hills, then sandhills
Milledgeville sits on the Fall Line, the band where the Georgia Piedmont ends and the Coastal Plain begins. So one county holds two kinds of ground: red clay hills north and west of town, and sand to the south.
Lake lots, hillside pads, old pasture
A Lake Sinclair lot where you cannot see the water
On a tight lake lot, which trees stay matters more than on a back forty.
A house pad and a drive on a red clay hillside
A house seat here has to be cut into a red clay hill.
Pasture and fence lines gone to pine and cedar
This is cattle and hay ground.

The details
The ground, the rules and who to call in Baldwin County.
The jobs here, one by one
A Lake Sinclair lot where you cannot see the water
On a tight lake lot, which trees stay matters more than on a back forty. I open the upland part with the John Deere 335P and the MK76 mulching head, keepers flagged first. The 25 foot strip at the water stays as it is unless Georgia Power has signed off.
A house pad and a drive on a red clay hillside
A house seat here has to be cut into a red clay hill. The John Deere 60P excavator takes the stumps out where the house, the drive and the septic field go, and the 335P does the rough shaping. What stays on the slope below the pad gets decided first, because bare clay washes.
Pasture and fence lines gone to pine and cedar
This is cattle and hay ground. Grass that sat a few seasons is work for the Massey Ferguson cab tractor and its batwing cutter. A mowing job by itself is a hard one to haul a tractor 219 miles for, so it fits here as part of a bigger job.
A cutover tract, woods roads and hunting land
After a harvest, what is left is tops, limbs and a flush of brush. The 335P with the MK76 head mulches it where it lies and reopens woods roads, lanes and food plots. Ten acres of brush and small trees runs an estimated $17,000 to $25,000 for the work, before delivery.
An old house, barn or mobile home that has to go
The John Deere 60P excavator with its thumb takes a structure down and loads it, and the debris is hauled off, never burned. Inside the city the job starts with paper: the demolition application asks about the Historic District and asbestos. Those get settled before a date does.
Trees down after a tornado or a storm line
We are close to five hours away, so call a local tree service for the tree on the roof. Where we fit is the cleanup after that: a whole lot or several acres of downed and leaning trees, picked up with the 60P excavator and the Blue Diamond root grapple.
The ground around Milledgeville
The New Georgia Encyclopedia describes the Fall Line as a boundary about twenty miles wide that runs across the state from Columbus to Augusta. North of it lie hard Piedmont rock, clay soils and narrow stream valleys. South of it, sandy soils take over. Milledgeville was built where that line crosses the Oconee River.
North and west of town: red clay hills
About four acres in ten in Baldwin County are red Piedmont clay. The soil survey calls the three main ones Cecil, Davidson and Vance. Cecil alone covers about one acre in five. In its typical profile it has roughly eight inches of sandy loam on top and firm red clay under that.
Much of it is steep, and much of it has already lost its topsoil. The single biggest soil unit in the county is Cecil sandy clay loam on slopes of 10 to 25 percent, and the survey maps it as moderately eroded. That is more than 11,000 acres. The New Georgia Encyclopedia tells why: cotton farming wore the Piedmont topsoil off, and pine grew back on the worn out fields.
Here is our reading of that for clearing work. Clay holds a grade and packs firm under a house pad or a drive. It is also slick when wet, it ruts under a machine that works it wet, and a bare clay slope washes in a hard rain. So on a hillside lot here, the order of the work and what stays on the slope matter as much as what comes off.
Rock under the steep ground
About 7 percent of the county is a soil the survey calls Wilkes, nearly all of it on slopes of 10 to 25 percent. The survey rates it shallow. In its typical profile, soft weathered rock starts about 16 inches down and hard rock about 51 inches down. That can change a stump pull, a grading cut or a footing dig. I look at that ground before anybody puts a number on digging in it.
South and east of town: sandhills
Cross to the Coastal Plain side and the clay gives way to sand. Lakeland sand, Ailey, Norfolk and Orangeburg soils together cover more than a fifth of the county. The survey says Lakeland is sand to a depth of more than 80 inches and drains very fast. Ailey is sand over a very firm, brittle layer that starts about three feet down.
This side is ground we know from home. Orangeburg loamy sand is the soil the survey maps under Quincy itself, and Lakeland sand is mapped in Gadsden County too. Loose sand is easy on a machine after rain. Left bare, it blows and washes.
The hills are real
Wikipedia gives the elevation of the city as 330 feet. The U.S. Geological Survey elevation service reads about 242 feet at the Oconee River Greenway, 343 feet downtown and 500 feet at Scottsboro, a few miles south. Those are sample points, not the official low and high of the county. They do show a couple hundred feet of rise in a short drive.
The Oconee, its bottoms and Lake Sinclair
The Oconee River runs just east of downtown. About one acre in eight in the county is creek or river bottom. The largest bottom soil, Wehadkee, is mapped as frequently flooded, and the survey rates it poorly drained to very poorly drained.
The river shows it. When the remains of Hurricane Helene passed in September 2024, the National Weather Service report put radar estimates at six to seven inches of rain over the county, on average. The Oconee crested in minor flood and covered parts of the Oconee River Greenway Park and low ground near the river. Bottom land like that is not ground to promise a date on. It gets looked at first, and it waits until it is dry.
Just north of the city, Sinclair Dam holds the Oconee back as Lake Sinclair. The lake was made in 1953, and Georgia Power operates it. It covers about 15,300 acres and reaches into three counties: Baldwin, Putnam and Hancock. That county line matters for permits and for burning, and the rules further down say how.
The ground in Baldwin County, by share of the county
| Ground | Share | What the soil survey says | What it means for the work |
|---|---|---|---|
| Red clay uplands (Cecil, Davidson, Vance) | About 40 percent | Sandy loam or loam over red clay. Vance clay is rated very firm, sticky and slow to take water. Large areas are mapped as eroded. | Packs firm and holds a grade. Slick and quick to rut when wet. Bare slopes wash. |
| Shallow ground over rock (Wilkes) | About 7 percent | Rated shallow, on slopes of 10 to 25 percent. Soft weathered rock about 16 inches down in the typical profile. | Digging and stump pulling can hit rock. Gets a look before a price. |
| Sandhills (Lakeland, Ailey, Norfolk, Orangeburg) | More than 20 percent | Sand and loamy sand. Lakeland is sand past 80 inches. Ailey has a brittle layer about three feet down. | Drains fast and carries a machine after rain. Blows and washes if it is left bare. |
| Creek and river bottoms (Wehadkee, Chewacla and Starr, Congaree and Toccoa) | About 13 percent | Floodplain soils. Wehadkee is mapped as frequently flooded. | Work waits for dry ground. Stream buffer and wetland rules can apply. |
| Open water | About 4 percent | Lake Sinclair, the Oconee River and ponds. | The strip along the water has rules of its own. See the rules further down. |
Red clay uplands (Cecil, Davidson, Vance)Share: About 40 percent
What the soil survey says
Sandy loam or loam over red clay. Vance clay is rated very firm, sticky and slow to take water. Large areas are mapped as eroded.
What it means for the work
Packs firm and holds a grade. Slick and quick to rut when wet. Bare slopes wash.
Shallow ground over rock (Wilkes)Share: About 7 percent
What the soil survey says
Rated shallow, on slopes of 10 to 25 percent. Soft weathered rock about 16 inches down in the typical profile.
What it means for the work
Digging and stump pulling can hit rock. Gets a look before a price.
Sandhills (Lakeland, Ailey, Norfolk, Orangeburg)Share: More than 20 percent
What the soil survey says
Sand and loamy sand. Lakeland is sand past 80 inches. Ailey has a brittle layer about three feet down.
What it means for the work
Drains fast and carries a machine after rain. Blows and washes if it is left bare.
Creek and river bottoms (Wehadkee, Chewacla and Starr, Congaree and Toccoa)Share: About 13 percent
What the soil survey says
Floodplain soils. Wehadkee is mapped as frequently flooded.
What it means for the work
Work waits for dry ground. Stream buffer and wetland rules can apply.
Open waterShare: About 4 percent
What the soil survey says
Lake Sinclair, the Oconee River and ponds.
What it means for the work
The strip along the water has rules of its own. See the rules further down.
Shares are sums of soil map unit acres for Baldwin County from the USDA Natural Resources Conservation Service, read November 12, 2026. The soils not listed make up the rest. The right hand column is our reading for clearing and grading. A soil map is a starting point, and I look at the dirt itself.
What grows here
What grows on a place here follows which side of the Fall Line it is on. The soil survey lists the trees for each kind of ground in this county.
- Red clay uplands: loblolly and Virginia pine with red oak, white oak, post oak, hickory, blackgum, maple and dogwood.
- Steep, shallow ground: shortleaf, loblolly and Virginia pine, eastern red cedar and oaks.
- Sandhills: pines. That is all the survey says for wooded Ailey ground.
- Creek and river bottoms: sweetgum, blackgum and water oak, with willow, poplar, hickory, beech and elm.
More on what grows here
The Piedmont side was oak and hickory forest before it was cotton land. The pine came later, on the fields that were farmed out and left. So a grown up place north of town is likely to be pine that seeded in by itself, with the hardwoods from that list mixed through it.
That thicket is work for the John Deere 335P with the MK76 mulching head. It grinds brush and small trees where they stand and leaves the mulch on the ground. On eroded clay that matters, because the slope is never stripped bare. The white oaks, the post oaks, the hickories and the straight pines are the usual keepers. You decide, and they get flagged before the machine starts. The method is on the forestry mulching page.
A mulching head cuts at ground level. The roots stay, and brush sprouts back from them. Where a house, a drive or a septic field is going, the stumps come out with the John Deere 60P excavator. That digging is where the clay and the rock under it come into the price.
Bartram Forest shows what managed woods look like here
South of town, Bartram Forest covers 2,113 acres in Baldwin and Wilkinson counties. The state owns it and the Georgia Forestry Commission manages it for timber and wildlife. The land was once a farm for patients of Central State Hospital. It is the local example of woods that are worked on purpose. Timber is harvested there, and people hike, ride and bow hunt it.
The storm that counts here was a tornado
On the morning of March 26, 2023, an EF1 tornado crossed the north side of Milledgeville. Its path was about seven miles long and up to 250 yards wide. It damaged numerous homes and a large part of the roof of the Atrium Health Navicent Baldwin hospital. The Union-Recorder reported winds over 100 miles an hour and trees down around the hospital walking trail. The county emergency management director told the paper that nobody was hurt or killed.
Hurricanes are a different story this far inland. For Helene in 2024, the National Weather Service report for Baldwin County lists one tree down across State Route 22 and minor flooding on the Oconee. So we will not tell you this is hurricane country. Trees come down here in tornadoes and thunderstorms.
A fair question for any crew from down south: cogongrass
Our home country is where Georgia fights cogongrass. The Georgia Forestry Commission says every new detection in early 2026 was in the southwest of the state, and it names Decatur, Grady and Thomas, Georgia counties close to our yard in Quincy, among the most active. Baldwin County is not named in that update. Oregon State Extension says tracked machines can carry weed seed in their treads and that washing equipment between jobs helps. So ask any crew that hauls in from that part of the state how the machine was cleaned before it was loaded. Ask us too.
Rules and permits in Baldwin County
Three questions decide which rules apply to land here. Is it inside the Milledgeville city limits? Which county is it in? Lake Sinclair alone touches three. And how close is it to water? We name the office for each rule below. A call there before a machine is loaded in Quincy costs nothing. A stop work order after it arrives costs a lot.
Inside Milledgeville: a city permit before anyone is paid to cut a tree
The city Tree Service Permit form cites Section 9-26 of the city code. By the form, anyone who cuts trees for pay must first get a permit from the Building Official, giving the place and the date of the cutting. Taking the wood as payment counts as pay. The form says no limbs, stumps or logs may be put on the street right of way, and it gives the fine as up to $1,000. Ask the Building Official at (478) 414-4021 for the fee.
Inside Milledgeville: land disturbance, grading and logging
The city issues its own permit for land disturbance. The application covers four kinds of work: land disturbance, grading, storm water impact and logging. It prints a land disturbance fee of $40 for up to one acre, a permit fee of $25, no charge for logging, and a bond of $300 per acre or part of an acre. It asks how far the work is from the nearest state water, whether an erosion and sediment control plan is attached, and who the 24 hour local contact for the erosion controls is. Fees change, so confirm them with the city.
Inside Milledgeville: 100 feet along the Oconee stays in natural growth
The city code sets up an Oconee River Corridor Protection Overlay District. It covers all land within 100 feet of the river bank on the west side of the Oconee inside the city, islands included. A natural vegetative buffer has to be kept there, and construction in the buffer is prohibited except where the code allows it. Timber harvesting under Georgia Forestry Commission best management practices is one listed exception. Ask Planning and Zoning before any work near the river.
Inside Milledgeville: taking a building down
The city Demolition Application asks two questions first. Is the building in the Historic District? If so, exterior changes must be approved by the Historic Commission. Does the job include cement asbestos roofing or siding? If so, the form says no permit can be issued without approval of the Georgia Department of Natural Resources. The form requires the contractor and every subcontractor to hold a city or county business license. It calls for 24 hours notice for inspections, a call to 811, and all utilities dropped or capped before the work starts. Separately, Georgia EPD requires an asbestos project notification 10 business days before any demolition.
Outside the city: Baldwin County has clearing permits by name
The county Land Use Code that went to public hearing on November 5, 2024 applies to unincorporated Baldwin County. It defines a clearing permit (trees and other growth removed), a clearing and grubbing permit (stumps out too) and a development permit. It counts clearing and grubbing as development when land is being turned to a new use for people. Clearly agricultural use, meaning cultivation, dairying or animal husbandry, is outside the code. The Land Use Administrator can order unauthorized work stopped, and the fine is up to $500 per occurrence. Call the county at (478) 445-4205 before you plan around it.
No county zoning in 2023, and the rules are moving
The 2023 joint plan of the county and the city says Baldwin County had no zoning code and was considering one for the years 2023 to 2028. A year later the Land Use Code above went to hearing. So do not go by what a neighbor did five years ago. Ask the county what applies to your parcel before you cut.
On Lake Sinclair: Georgia Power sets the shoreline rules
Georgia Power requires its written permit before any work on its land or inside its project boundary. Its Lake Sinclair guidelines allow no mechanical clearing, grubbing or change of the land contour in the 25 foot vegetative buffer without written approval first. Unauthorized clearing within 25 feet of the shoreline on an undeveloped lot is prohibited. Georgia Power considers taking a tree off its land in three cases: a dead or damaged tree that is a hazard, room for construction such as a home, a seawall or a septic system, or a gain in conservation value. Where it allows cutting, it requires replanting one for one. No part of a downed tree may be left on its property or in the lake. The office for Lake Sinclair is the East Georgia Lakes Lake Resource Office in Eatonton, (706) 484-7500, by appointment only.
The Georgia rules under all of it: one acre, 200 feet, 25 feet
Georgia law exempts a project that disturbs less than one acre from the state erosion act. The exemption is gone when the work is part of a larger plan of an acre or more, or when it is within 200 feet of the bank of state waters. A city or county that issues its own permits may still regulate smaller jobs, and both Baldwin County and Milledgeville are on the state list of local issuing authorities. The state construction permit keeps a 25 foot undisturbed buffer along state waters, and Georgia Power cites the same 25 feet for Lake Sinclair. Farm work is exempt, including preparing and planting pasture. So is forestry, with a catch. If forestry work disturbs a stream buffer, no other land disturbing work is allowed on the whole property for three years.
Burning: the county line decides the summer
Burn permits in Georgia come from the Georgia Forestry Commission. Hand piled leaves and limbs need no permit. Debris piled by a machine counts as land clearing. The Commission says to contact it first for a notification or a burn permit, and a permit is good only for the day it is issued. Its page adds that such a burn may need an air curtain destructor, depending on the county. State rules put a land clearing burn at least 1,000 feet from any occupied structure unless the state approves less. Then there is the summer ban, May 1 to September 30, in 54 counties. Baldwin County is not on that list, and neither is Hancock. Putnam, Jones and Bibb are. So in July a pile on the Baldwin side of Lake Sinclair is not under the summer ban, though it still needs the Commission. The same pile on the Putnam side cannot be burned. In November 2025, Baldwin County Fire Rescue reminded residents to follow the Commission rules before lighting any burn, and that burning household garbage is prohibited.
Sources
- Burn Permits and Notifications (opens in a new tab)
- Open Burning Rules for Georgia (opens in a new tab)
- Open Burning Rules for Georgia (opens in a new tab)
- Summer Open Burning Ban (opens in a new tab)
- Baldwin County Fire Rescue issues safety reminder on proper outdoor burning practices (opens in a new tab)
Forestry mulching leaves no pile, so none of the burn rules come into play. The guide on mulching, bulldozing and burning sets the three methods side by side. The permit guide goes deeper on the Georgia rules.
This is not legal advice. Putnam and Hancock counties have rules of their own for the far shores of Lake Sinclair. The office named gives the answer for your parcel, and when I look at your land and spot a permit question, I will name the office to ask.
Who to call
City of Milledgeville, Building Official (Planning and Zoning)
Inside the city limits: the Tree Service Permit, land disturbance and grading permits, the Demolition Application, the Historic District and the Oconee River corridor. The office is at 105 East Hancock Street.
City of Milledgeville, City Hall
The main city line, at 119 East Hancock Street, when you are not sure which department to ask.
Baldwin County, building and land disturbance permits
Outside the city limits: clearing, clearing and grubbing, and development permits. County offices are at 1601 North Columbia Street. The number is the one the Georgia EPD list of August 2025 gives for the county as a local issuing authority.
Georgia Power, East Georgia Lakes Lake Resource Office
Anything on Georgia Power land or inside the 25 foot shoreline strip at Lake Sinclair. 125 Wallace Dam Road, Eatonton. Monday to Friday, 8 a.m. to 5 p.m., by appointment only.
Putnam County Planning and Development
Land disturbance questions for a Lake Sinclair lot on the Putnam County side. For the Hancock County side, the same Georgia EPD list gives (706) 444-0978.
Georgia Forestry Commission, burn permits
Permits for land clearing burns and machine piled debris. The Commission lists this line as 1 800 GA TREES.
Georgia EPD, Erosion and Sedimentation Unit
The state erosion rules and stream buffers, when the local office sends you on.
Georgia EPD, Land Protection Branch
The asbestos project notification that is due 10 business days before a demolition.
Georgia 811
Utility locates before any digging. Georgia 811 says to put the ticket in at least 3 business days ahead.
The drive from Quincy
Milledgeville is about 219 road miles from Quincy, close to five hours by car and about double our normal 100 mile radius. There is no time change.
We take jobs here by arrangement, and they are usually larger ones that justify moving equipment this far: acreage, several lots, or a tear down with the site work after it.
Near home there is no equipment delivery charge inside about 30 road miles of Quincy, then about $10 a road mile for one machine and one and a half times that for two out to the edge of the radius. Past 100 miles there is no formula. The quote tool still shows a range for the work, and I quote the delivery myself once I know the job.
If you also have ground toward Sparta, about 23 miles on, say so and ask whether one haul can serve both.
Places around Milledgeville, by arrangement
Hardwick, Scottsboro, Coopers, Browns Crossing, Meriwether, Oconee Heights, Harrisburg, Lake Sinclair, the Baldwin County shore, The US 441 corridor between town and the lake, Sparta, in Hancock County.
Questions about Milledgeville
Do you really come to Milledgeville from Quincy, Florida?
Yes, by arrangement. Milledgeville is about 219 road miles from Quincy, so the jobs I take here are ones worth moving equipment for: acres of mulching, several lots at once, a demolition with the site prep after it. Every job has a $2,000 minimum, and I quote equipment delivery on top. Call or text (850) 509-9036 and tell me what you have.
What does it cost to bring the machines this far?
I quote it myself for each job, and how many machines make the trip is the first thing it depends on. The instant quote shows a range for the work with the delivery line left open. As a guide, five acres of brush and small trees mulched runs an estimated $9,550 to $14,100 for the work, and ten acres $17,000 to $25,000.
Do I need a permit to cut trees or clear land in Milledgeville or Baldwin County?
Inside the city, plan on it: anyone cutting trees for pay needs a permit from the Building Official first, and land disturbance, grading and demolition have city permits of their own. That office is at (478) 414-4021. Outside the city, call the county at (478) 445-4205 before you plan.
Can you clear my Lake Sinclair lot all the way to the water?
Not without Georgia Power. Its guidelines allow no mechanical clearing within 25 feet of the shoreline without written approval first. I can open the lot above that line: mulch the underbrush, keep the trees you flag, and stay out of the strip at the water. The Georgia Power lake office is in Eatonton at (706) 484-7500.
More questions
Can the brush be burned? Is there a summer burn ban in Baldwin County?
Baldwin County has no summer burn ban, but Putnam and Jones, next door, do, from May 1 to September 30. In any county, burning machine piled debris takes a one day permit from the Georgia Forestry Commission, (800) 428-7337. Forestry mulching skips all of it, because there is no pile.
Is my ground clay or sand, and when is the best time for the work?
It depends on which side of the Fall Line you are on. North and west of town, toward Lake Sinclair, expect rolling red clay, shallow to rock in places. South and east it turns to sandhills, with wet creek and river bottoms. The best time is when the soil is dry, so on a haul this long I set the dates with the forecast in view.
How does the estimate work when you are almost five hours away?
This far out the tool does not book a visit, so call or text (850) 509-9036. The instant quote still gives a range for the work. Have four things ready: whether the land is inside the city limits, which county it is in if it is on Lake Sinclair, how close the work comes to water, and which trees you want kept.
Guides
Sources (47)
Sources
Rules change. Every link below was read between November 11 and November 12, 2026. Check with the office named before you act on it.
Driving route, downtown Quincy, Florida to downtown Milledgeville, Georgia (218.6 miles, 4 hours 46 minutes without traffic) (opens in a new tab). Project OSRM public routing service, on OpenStreetMap data. Checked .
The same route with its turn by turn steps (US 27, Georgia 111 and 112, US 19, Georgia 300, Interstate 75, Georgia 49) (opens in a new tab). Project OSRM public routing service, on OpenStreetMap data. Checked .
Driving route, downtown Milledgeville to Sparta, Georgia (about 23 miles, about 35 minutes without traffic) (opens in a new tab). Project OSRM public routing service, on OpenStreetMap data. Checked .
Milledgeville, Georgia (opens in a new tab). Wikipedia. Checked .
Baldwin County, Georgia (opens in a new tab). Wikipedia. Checked .
Lake Sinclair (opens in a new tab). Wikipedia. Checked .
Bartram Forest (opens in a new tab). Wikipedia. Checked .
List of United States tornadoes in March 2023 (EF1, northern Milledgeville, March 26) (opens in a new tab). Wikipedia, from National Weather Service survey data. Checked .
Milledgeville (opens in a new tab). New Georgia Encyclopedia. Checked .
Fall Line (opens in a new tab). New Georgia Encyclopedia. Checked .
Piedmont Geographic Region (opens in a new tab). New Georgia Encyclopedia. Checked .
Soil Data Access, soil survey area GA604 (Baldwin, Jones, and Putnam Counties, Georgia): map units and acres inside Baldwin County (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Soil Data Access, soil survey area FL039 (Gadsden County, Florida): the map unit under Quincy (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Official Series Description: Cecil series (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Official Series Description: Davidson series (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Official Series Description: Vance series (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Official Series Description: Wilkes series (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Official Series Description: Wehadkee series (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Official Series Description: Lakeland series (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Official Series Description: Ailey series (opens in a new tab). USDA Natural Resources Conservation Service. Checked .
Elevation Point Query Service (3DEP): elevations at sample points in Baldwin County (opens in a new tab). U.S. Geological Survey. Checked .
Post Tropical Cyclone Report, Hurricane Helene: impact narratives by county (Baldwin County) (opens in a new tab). National Weather Service, Peachtree City. Checked .
EF-1 tornado tore through parts of Milledgeville one year ago (March 26, 2024) (opens in a new tab). The Union-Recorder, Milledgeville. Checked .
2023 Baldwin County Joint Comprehensive Plan (Baldwin County and the City of Milledgeville) (opens in a new tab). Georgia Department of Community Affairs. Checked .
Baldwin County annual report sheet (county farm gate value and top commodities) (opens in a new tab). University of Georgia Cooperative Extension. Checked .
Cogongrass in Georgia, Spring 2026 Update (opens in a new tab). Georgia Forestry Commission. Checked .
Reducing Hazardous Fuels on Woodland Property: Mechanical Treatments (EC 1575) (opens in a new tab). Oregon State University Extension Service. Checked .
Mastication Considerations for Forest Landowners (2026) (opens in a new tab). University of California Agriculture and Natural Resources. Checked .
Chapter 16, Land Development Code (The Land Use Codes of Baldwin County, Georgia), as printed in the public hearing packet of November 5, 2024 (opens in a new tab). Baldwin County Board of Commissioners. Checked .
Planning and Zoning (permits, forms and contacts) (opens in a new tab). City of Milledgeville, Georgia. Checked .
Tree Service Permit Application (cites Section 9-26 of the Code of Ordinances) (opens in a new tab). City of Milledgeville, Georgia. Checked .
Development Permit Application, Land Disturbance (form dated 4-25) (opens in a new tab). City of Milledgeville, Georgia. Checked .
Demolition Application (opens in a new tab). City of Milledgeville, Georgia. Checked .
Land Development Code, Articles 3 and 4 (Oconee River Corridor Protection Overlay District) (opens in a new tab). City of Milledgeville, Georgia. Checked .
Bartletts Ferry, Jackson, and Sinclair Shoreline Guidelines (opens in a new tab). Georgia Power. Checked .
Shoreline Management (Lake Resource Offices) (opens in a new tab). Georgia Power. Checked .
Local Issuing Authority summary list, updated August 2025 (Baldwin County and City of Milledgeville) (opens in a new tab). Georgia Environmental Protection Division. Checked .
Official Code of Georgia 12-7-17: exemptions from the Erosion and Sedimentation Act (opens in a new tab). State of Georgia, public copy on Fastcase linked from the Georgia Secretary of State. Checked .
General Permit GAR100001: stormwater discharges from stand alone construction activity (2023) (opens in a new tab). Georgia Environmental Protection Division. Checked .
Burn Permits and Notifications (opens in a new tab). Georgia Forestry Commission. Checked .
Open Burning Rules for Georgia (opens in a new tab). Georgia Environmental Protection Division. Checked .
Open Burning Rules for Georgia: burn types and their conditions (opens in a new tab). Georgia Environmental Protection Division. Checked .
Summer Open Burning Ban (May 1 to September 30, 54 counties) (opens in a new tab). Georgia Environmental Protection Division. Checked .
Baldwin County Fire Rescue issues safety reminder on proper outdoor burning practices (November 2025) (opens in a new tab). 1st Responder News. Checked .
Asbestos Licensing and Notifications (opens in a new tab). Georgia Environmental Protection Division, Land Protection Branch. Checked .
Erosion and Sedimentation (opens in a new tab). Georgia Environmental Protection Division, Watershed Protection Branch. Checked .
The 811 Process (opens in a new tab). Georgia 811. Checked .