You bought ten acres outside Quincy and want the back half opened up. Before a machine comes off the trailer, find out who has to sign off.
It depends on where the land is and what it will become. A brush pile, a wet corner, a tortoise burrow and a buried gas line each have their own rule.
When clearing itself needs a permit
This one is local. Here is what each office publishes.
Florida
Gadsden County, outside city limitsThe county has a Tree Removal and Clearing Permit application with a $100 fee.
The site drawing must show the limits of clearing and every protected tree (20 inches or more across the trunk at chest height) with a barricade at the drip line. On land headed for development, clearing before approval takes a letter of permission from the Planning Department. The code exempts placing one detached house on a lot from the tree protection rules. It also exempts forestry that follows state best management practices, though not Champion Trees. Ask Planning which case is yours.
Sources
- Tree Removal & Clearing Permit Application (rev. 10/20/2020) (opens in a new tab)Gadsden County Planning Division
- Land Development Code, Chapter 5: Development Standards, Subsection 5404 (dated 12/19/2023) (opens in a new tab)Gadsden County, Florida
Leon County and the City of TallahasseeOutside the city, Leon County requires an environmental management permit for tree removal projects.
On a developed lot it depends on the site: canopy road zones, wetlands, floodplains, slopes and zoning. Inside Tallahassee, removing a protected tree takes an Environmental Management Permit or a tree permit, and one tree permit covers no more than 10 trees. The city defines protected trees by species and size. Ask the city which sizes count.
Sources
- Environmental Permits (opens in a new tab)Leon County, Florida
- Environmental Services: Frequently Asked Questions (opens in a new tab)Leon County Development Support and Environmental Management
- Tree Permit (opens in a new tab)City of Tallahassee Growth Management
Jefferson and Suwannee countiesJefferson County issues no building permit without a Development Permit from its Planning Department first.
The City of Live Oak says tree removal may require a Tree Removal Permit, and to contact its zoning department before you remove any tree. Suwannee County Planning and Zoning issues land use permits. Check with those offices before you clear.
Sources
- Planning, Zoning & Land Use (opens in a new tab)Jefferson County, Florida
- Code Enforcement (opens in a new tab)City of Live Oak, Florida
- Planning & Zoning (opens in a new tab)Suwannee County Board of County Commissioners
Georgia
Valdosta and Lowndes CountyInside Valdosta, no land disturbing activity may start without a land disturbance permit from the City Engineering Department, unless the work is exempt.
The application names clearing and grubbing. Tree removal on non residential property needs Arbor Division approval first. The tree ordinance lists tree removal by individual single family homeowners as exempt. Outside the city, a land disturbance application with an erosion and sediment control plan goes to Lowndes County Engineering. The county also wants a notice for all timber harvesting.
Sources
- Land Development Regulations, Chapter 302, Article 5: Development Permits (Section 302-44) (opens in a new tab)City of Valdosta, Georgia
- Land Disturbance Permit Application (revised February 2024) (opens in a new tab)City of Valdosta Engineering Department
- Arbor Division (opens in a new tab)City of Valdosta, Georgia
- Land Development Regulations, Chapter 328: Landscape, Buffers and Screening (Section 328-14) (opens in a new tab)City of Valdosta, Georgia
- Technical Standards (Engineering forms and applications) (opens in a new tab)Lowndes County, Georgia, Engineering
Albany, Bainbridge and Decatur CountyThe City of Albany permits tree removal on private property under a site plan permit, or through an application for dead, dying, diseased or hazardous trees.
Bainbridge and Decatur County share one office that takes tree removal requests. For land disturbance, Decatur County points you to Georgia EPD.
Sources
- Arborist (opens in a new tab)City of Albany, Georgia, Engineering Department
- Building and Planning (opens in a new tab)Decatur County, Georgia
Inside Quincy, call City Hall. In Jackson County, Marianna, Monticello, Dougherty County outside Albany, Milledgeville or Sparta, call the county planning office before you clear.
Burning the pile
Clearing with the stumps out leaves a pile. Before anyone lights it, both states want a call.
Florida: an authorization for every land clearing pileEvery land clearing pile burn needs an authorization from the Florida Forest Service before it is lit.
For a home site, the pile must be 300 feet from any occupied building that is not yours, 100 feet from a paved public road and 50 feet from wildlands or brush. For construction, subdivisions and land development, it is 1,000 feet from any occupied building. Piles must be dry and attended at all times. Request the authorization from your local Forest Service office on the day of the burn.
Sources
- Know the Law: Land Clearing Debris Burns with ACI (opens in a new tab)Florida Department of Agriculture and Consumer Services, Florida Forest Service
- Section 590.125, Florida Statutes: Open burning authorized by the Florida Forest Service (opens in a new tab)The Florida Legislature, Online Sunshine
- Steps to get a prescribed burning authorization in Florida (opens in a new tab)Florida Department of Agriculture and Consumer Services, Florida Forest Service
Georgia: a permit for machine piled debrisGeorgia needs no permit for hand piled leaves and limbs.
Land clearing is different. Debris piled by a machine counts as a land type change, and the burner must get a permit from the Georgia Forestry Commission first. It is good only for the day it is issued. State rules keep the fire at least 1,000 feet from any occupied structure unless EPD approves less, and allow only plant growth on the pile. Depending on the county, an air curtain destructor may be required. The summer burn ban, May 1 to September 30, covers 54 counties. Lowndes, Dougherty and Decatur are not on the list. City and county burn ordinances still apply where they exist.
Sources
- Burn Permits and Notifications (opens in a new tab)Georgia Forestry Commission
- Open Burning Rules for Georgia (opens in a new tab)Georgia Environmental Protection Division
- Burn Types (opens in a new tab)Georgia Environmental Protection Division
- Summer Open Burning Ban (opens in a new tab)Georgia Environmental Protection Division
Forestry mulching skips the pile. The John Deere 335P with the MK76 head shreds brush and small trees where they stand, so nothing is lit. That removes the burn question, not the others. A protected tree is protected no matter which machine reaches it.
Gopher tortoises in Florida
The 25 foot ruleGopher tortoises and their burrows are protected by Florida law.
A relocation permit from the Florida Fish and Wildlife Conservation Commission (FWC) must be in hand before a burrow is disturbed, and any work within 25 feet of a burrow counts: clearing, grading, even parking heavy equipment. Keep all of the work at least 25 feet away and FWC says you may not need a permit. The distance crosses the property line. Collapse a neighbor's burrow by clearing within 25 feet of it and you may still be held responsible. Under its enforcement policy, FWC does not require a permit for farming or forestry work such as mowing and tree cutting. Clearing for a house is not that.
Sources
- Gopher Tortoise Permits (opens in a new tab)Florida Fish and Wildlife Conservation Commission
- Gopher Tortoise FAQs (opens in a new tab)Florida Fish and Wildlife Conservation Commission
So burrows are one of the things to look for when I walk the land with you, before a machine moves. In Georgia, ask the Department of Natural Resources about protected wildlife before you clear.
Wetlands and surface waters
The low corner that holds water after a rain may be a regulated wetland. That call belongs to the water management district, the state and the Corps of Engineers, not to a contractor.
FloridaThe Environmental Resource Permit program covers dredging and filling in wetlands and other surface waters, and stormwater from new construction.
In the Northwest Florida Water Management District, which includes Gadsden, Leon and Jackson counties, that takes in isolated wetlands too. The federal permit is separate: Section 404 applications in Florida go to the U.S. Army Corps of Engineers. Farm and forestry work on land classified agricultural is exempt only as normal and customary practice, never when the main purpose is to divert water or harm wetlands.
Sources
- Environmental Resource Permitting Coordination, Assistance, Portals (opens in a new tab)Florida Department of Environmental Protection
- Environmental Resource Permits (opens in a new tab)Northwest Florida Water Management District
- State 404 Program (opens in a new tab)Florida Department of Environmental Protection
- Section 373.406, Florida Statutes: Exemptions (opens in a new tab)The Florida Legislature, Online Sunshine
Near Monticello and Live Oak, ask which water management district your parcel is in. In Georgia, ask the county or Georgia EPD before you clear wet ground.
Land disturbance and stormwater: what one acre means
You will hear that nothing under an acre needs a permit. Neither state says that.
FloridaConstruction that disturbs 1 acre or more needs coverage under the state construction stormwater permit when the runoff reaches state waters or a city storm sewer.
A smaller site inside a larger plan of development is covered too. The notice goes to DEP at least 2 calendar days before work starts, and the fee is $250 for 1 to 5 acres or $400 for 5 or more. That acre is a stormwater line only. Local tree and clearing permits have their own triggers.
Source
- Construction Activity (opens in a new tab)Florida Department of Environmental Protection
GeorgiaClearing, grading and excavating all count as land disturbing activity.
At 1 acre or more, the state construction stormwater permits apply. Under 1 acre, a project is exempt from the state erosion law, unless it is part of a larger plan of 1 acre or more or within 200 feet of the bank of state waters. A city or county that issues permits may still regulate it.
Sources
- Rule 391-3-7-.01: Definitions (Erosion and Sedimentation Control) (opens in a new tab)Rules and Regulations of the State of Georgia, Georgia Secretary of State
- NPDES General Permit GAR100001: stormwater from stand alone construction projects (2023) (opens in a new tab)Georgia Environmental Protection Division
- O.C.G.A. 12-7-17: Exemptions (Erosion and Sedimentation Act) (opens in a new tab)Official Code of Georgia, public copy linked from the Georgia Secretary of State rules site
Georgia's stream buffer
Twenty five feet along state watersGeorgia keeps a 25 foot undisturbed vegetated buffer along state waters that require one, and 50 feet on trout streams.
Lowndes County, for one, requires a buffer variance before any land disturbing activity inside the 25 feet. Forestry is exempt from the erosion law, with a catch: if it disturbed a buffer, no other land disturbance is allowed on the whole property for three years.
Sources
- NPDES General Permit GAR100001: stormwater from stand alone construction projects (2023) (opens in a new tab)Georgia Environmental Protection Division
- Technical Standards (Engineering forms and applications) (opens in a new tab)Lowndes County, Georgia, Engineering
- O.C.G.A. 12-7-17: Exemptions (Erosion and Sedimentation Act) (opens in a new tab)Official Code of Georgia, public copy linked from the Georgia Secretary of State rules site
Do not carry that number across the state line. In Florida, 25 feet is the tortoise burrow distance, not a stream buffer.
Demolition
Tearing down a house, a barn or an old single wide is work for the John Deere 60P and its hydraulic thumb. The paperwork starts before the demolition does.
Florida: permit and asbestos noticeUnless another law provides otherwise, it is unlawful to demolish any building in Florida without first getting a permit from the enforcing agency.
Check with your county or city building department. For buildings covered by the federal asbestos rule, the owner or operator must inspect for asbestos and notify DEP at least 10 working days before demolition begins. The notice costs $200, or $100 filed and paid online in one step. Do not assume a house or a trailer is exempt. Ask.
Sources
- Section 553.79, Florida Statutes: Permits; applications; issuance; inspections (opens in a new tab)The Florida Legislature, Online Sunshine
- Asbestos (opens in a new tab)Florida Department of Environmental Protection
- 40 CFR 61.145: Standard for demolition and renovation (opens in a new tab)Electronic Code of Federal Regulations
Georgia: asbestos noticeGeorgia EPD requires a project notification through its online system 10 business days before any demolition, renovation or asbestos abatement.
Removing friable asbestos, the kind that crumbles, takes a Georgia licensed abatement contractor, in houses too. For the demolition permit itself, call the city or county building department first.
Sources
- Asbestos Licensing and Notifications (opens in a new tab)Georgia Environmental Protection Division
- Rule 391-3-14-.04 (Asbestos Removal and Encapsulation) (opens in a new tab)Rules and Regulations of the State of Georgia, Georgia Secretary of State
Old septic tanks and wells in FloridaA septic tank is abandoned under a DEP general permit: a notice of intent and approval first, a pump out by a permitted septage company, the tank ruptured, collapsed or removed, then filled with clean sand or other suitable material and covered.
Check with the environmental health office of your county health department before the tank is touched. Plugging an old well takes a permit that only a Florida licensed water well contractor can apply for.
Sources
- Form DEP 4011: General Permit for System Abandonment (draft form version) (opens in a new tab)Florida Department of Environmental Protection
- Well Permits: Frequently Asked Questions (opens in a new tab)Northwest Florida Water Management District
What cannot go on a burn pileA torn down building cannot be burned.
Florida makes it illegal to burn treated lumber, plastics, rubber and tires. Georgia makes it unlawful to burn man made materials such as shingles, plastics and lumber.
Sources
- Burn Authorizations (opens in a new tab)Florida Department of Agriculture and Consumer Services, Florida Forest Service
- Open Burning Rules for Georgia (opens in a new tab)Georgia Environmental Protection Division
Utility disconnects are set by each building department and utility. Ask the official who issues the demolition permit.
Call 811 before anything digs
Two states, two clocksFlorida law requires notice through Sunshine 811 not less than 2 full business days before any excavation or demolition.
The ticket is good for 30 calendar days. Two exemptions people cite are narrow: a homeowner digging no deeper than 10 inches on a single family lot, and normal farm work off any marked utility easement. Georgia 811 says to submit the ticket at least 3 business days before digging. Georgia's farming exemption covers only the tilling of fields.
Sources
- Section 556.105, Florida Statutes: Procedures (opens in a new tab)The Florida Legislature, Online Sunshine
- Section 556.108, Florida Statutes: Exemptions (opens in a new tab)The Florida Legislature, Online Sunshine
- The 811 Process (opens in a new tab)Georgia 811
- Georgia Dig Law (O.C.G.A. 25-9) (opens in a new tab)Georgia 811
A contractor digging out stumps with the 60P or tearing down a trailer should count on neither exemption. The locate request comes first.
Who to call, county by county
Only numbers found on an official page are listed. Offices move and numbers change, so confirm on the page under Sources.
| County | Clearing, trees and building permits | Burn pile |
|---|---|---|
| Gadsden (Quincy) | Gadsden County Planning Division, (850) 875-8663 | Florida Forest Service, Tallahassee Forestry Center, (850) 681-5951 |
| Leon (Tallahassee) | Outside the city: Leon County DSEM, (850) 606-1300. Inside: City of Tallahassee Growth Management, (850) 891-7001 | Tallahassee Forestry Center, (850) 681-5951 |
| Jefferson (Monticello) | Jefferson County Planning Department, (850) 342-0223. Inside Monticello: City Hall, (850) 342-0153 | Tallahassee Forestry Center, (850) 681-5951 |
| Jackson (Marianna) | Jackson County Planning Division, (850) 482-9637 | Florida Forest Service, Chipola Forestry Center, (850) 373-1801 |
| Suwannee (Live Oak) | Suwannee County Planning and Zoning, (386) 364-3401. Inside Live Oak: City Hall, (386) 362-2276 | Florida Forest Service, Suwannee Forestry Center, (386) 243-6243 |
| Decatur (Bainbridge) | Bainbridge and Decatur County building and planning office, (229) 248-2000 | Georgia Forestry Commission, 1-800-GA-TREES (428-7337) |
| Lowndes (Valdosta) | Outside the city: Lowndes County Engineering, (229) 671-2424. Inside: City of Valdosta Engineering, Arbor Division, (229) 259-3530 | Georgia Forestry Commission, 1-800-GA-TREES (428-7337) |
| Dougherty (Albany) | Inside Albany: City of Albany Engineering, (229) 302-1893 | Georgia Forestry Commission, 1-800-GA-TREES (428-7337) |
Local offices in our working area
Gadsden (Quincy)
Clearing, trees and building permits
Gadsden County Planning Division, (850) 875-8663
Burn pile
Florida Forest Service, Tallahassee Forestry Center, (850) 681-5951
Leon (Tallahassee)
Clearing, trees and building permits
Outside the city: Leon County DSEM, (850) 606-1300. Inside: City of Tallahassee Growth Management, (850) 891-7001
Burn pile
Tallahassee Forestry Center, (850) 681-5951
Jefferson (Monticello)
Clearing, trees and building permits
Jefferson County Planning Department, (850) 342-0223. Inside Monticello: City Hall, (850) 342-0153
Burn pile
Tallahassee Forestry Center, (850) 681-5951
Jackson (Marianna)
Clearing, trees and building permits
Jackson County Planning Division, (850) 482-9637
Burn pile
Florida Forest Service, Chipola Forestry Center, (850) 373-1801
Suwannee (Live Oak)
Clearing, trees and building permits
Suwannee County Planning and Zoning, (386) 364-3401. Inside Live Oak: City Hall, (386) 362-2276
Burn pile
Florida Forest Service, Suwannee Forestry Center, (386) 243-6243
Decatur (Bainbridge)
Clearing, trees and building permits
Bainbridge and Decatur County building and planning office, (229) 248-2000
Burn pile
Georgia Forestry Commission, 1-800-GA-TREES (428-7337)
Lowndes (Valdosta)
Clearing, trees and building permits
Outside the city: Lowndes County Engineering, (229) 671-2424. Inside: City of Valdosta Engineering, Arbor Division, (229) 259-3530
Burn pile
Georgia Forestry Commission, 1-800-GA-TREES (428-7337)
Dougherty (Albany)
Clearing, trees and building permits
Inside Albany: City of Albany Engineering, (229) 302-1893
Burn pile
Georgia Forestry Commission, 1-800-GA-TREES (428-7337)
For the City of Quincy, the City of Marianna, Dougherty County outside Albany, or Baldwin and Hancock counties (Milledgeville and Sparta), start with the county planning office.
| Question | Florida | Georgia |
|---|---|---|
| Wetlands and stormwater in Florida, erosion and stream buffers in Georgia | In the Panhandle: Northwest Florida Water Management District, (850) 951-4660 for a meeting before you apply | Georgia EPD, Erosion and Sedimentation Unit, (470) 524-4621 |
| Construction stormwater, 1 acre and up | Florida DEP stormwater program (opens in a new tab) | Georgia EPD, Watershed Protection Branch, (404) 463-1511 |
| Gopher tortoise burrows | FWC gopher tortoise permits (opens in a new tab) | Ask the Georgia Department of Natural Resources |
| Asbestos notice before demolition | Florida DEP asbestos program (opens in a new tab) | Georgia EPD, Land Protection Branch, (404) 657-8600 |
| Old wells | In the Panhandle: Northwest Florida Water Management District, (850) 539-5999 | Ask your county first |
| Utility locates | Sunshine 811: dial 811 or (800) 432-4770 | Georgia 811: dial 811 |
State offices
Wetlands and stormwater in Florida, erosion and stream buffers in Georgia
Florida
In the Panhandle: Northwest Florida Water Management District, (850) 951-4660 for a meeting before you apply
Georgia
Georgia EPD, Erosion and Sedimentation Unit, (470) 524-4621
Construction stormwater, 1 acre and up
Georgia
Georgia EPD, Watershed Protection Branch, (404) 463-1511
Gopher tortoise burrows
Georgia
Ask the Georgia Department of Natural Resources
Asbestos notice before demolition
Georgia
Georgia EPD, Land Protection Branch, (404) 657-8600
Old wells
Florida
In the Panhandle: Northwest Florida Water Management District, (850) 539-5999
Georgia
Ask your county first
Utility locates
Florida
Sunshine 811: dial 811 or (800) 432-4770
Georgia
Georgia 811: dial 811
How this fits a job with us
I walk the land with you before a machine starts and flag what stays. That walk is the time to point out the big oaks, the wet corner, any burrow and the property line. Our instant quote gives a price range. Permits are not part of it, as the cost guide explains.