Holt’sLand Clearing
and Preservation
Call(850) 509-9036Get my price rangePrice rangeCall

Quincy is home. Red clay, creek bottoms and all.

The back field went to privet, or the city wrote you about a lot you never walk. Our yard is in Quincy, and I walk your ground with you before a machine starts.

Our base
Quincy, Florida
We travel
100 miles out
County
Gadsden
Estimates
Free
Aerial photo of farm fields, blocks of planted pine and a dark pond north of Quincy, Florida, with a county road crossing the frame.
Farm fields and planted pine a few miles northeast of Quincy. Typical land here, not a job site.

Aerial: USGS NAIP, flown January 2023

A ridge, then creeks

Anybody who calls Florida flat has not driven out of Quincy. The town sits on a ridge a little over 200 feet up. From there the ground falls to the creeks.

Hillsides, old barns and privet

  • A grown up hillside, mulched with the mat left on it

    A hillside thicket on red clay washes if you scrape it bare.

    Forestry Mulching

  • An old barn, packing shed or trailer on farm land

    Shade tobacco left barns and packing sheds all over this county.

    Demolition

  • Privet and tallow out, longleaf and oaks left standing

    This is the job our name is about.

    Selective Clearing

All six jobs, one by one

John Deere 335P compact track loader with a John Deere MK76 forestry mulching head parked on grass in afternoon sun, dirt packed in its rubber tracks.
My John Deere 335P with the MK76 mulching head on.

The details

The ground, the rules and who to call in Gadsden County.

The jobs here, one by one
A grown up hillside, mulched with the mat left on it

A hillside thicket on red clay washes if you scrape it bare. I grind the brush where it stands with the MK76 mulching head, so the roots stay in the slope and the chips stay on it. The oaks and pines you flag stay too.

Forestry Mulching

An old barn, packing shed or trailer on farm land

Shade tobacco left barns and packing sheds all over this county. My John Deere 60P excavator with its thumb takes one apart and loads it on a truck. Florida asks for a building permit first, so ask the county or the city before you pick a date.

Demolition

Privet and tallow out, longleaf and oaks left standing

This is the job our name is about. I walk it with you and flag the keepers. The mulcher takes the privet and tallow under them, and nothing heavy parks on their roots. More in our tree protection guide.

Selective Clearing

Pasture, field edges and a lot the city wrote you about

The Massey Ferguson tractor with the batwing cutter keeps fields and edges open, and the mulcher reopens a fence line that grew shut. Our job minimum is $2,000, so one small town lot may cost more with us than it should. Ask, and I will say so.

Bush Hogging

A home site on the ridge

I clear the spots for the house, the drive and the septic field, pull the stumps there and rough grade for the pad. The rest of the lot can keep its trees. The erosion rules for a home lot are under Rules and permits, further down.

Site Preparation

Storm timber, most of all near the creek bottoms

Hurricane Michael in 2018 and Helene in 2024 laid timber down here, and trees tip first in the wet creek bottoms. The 60P excavator and the Blue Diamond root grapple pick it up and stack it or load it out. A tree on a power line belongs to the utility.

Hauling and Debris Removal

The ground around Quincy
A ridge above the creeks

These are spot heights we looked up at the U.S. Geological Survey. They are single points, not surveyed high and low marks. They still show the shape of the place: a drop of 40 to 110 feet from the square to the creeks, inside one to five miles.

Mount Pleasant
297 feet
Interstate 10 at State Road 267
247 feet
Quincy Municipal Airport
215 feet
Courthouse square
205 feet
Tanyard Creek
167 feetSouth east side of town
Quincy Creek
129 feetNorth side of town
Little River
93 feetAbout five miles east
Lake Talquin
84 feet

The name for this country is the Tallahassee Hills. It covers most of Gadsden and Leon counties, and the Florida Natural Areas Inventory⁠ (opens in a new tab) says streams carved it into rolling hills. The Northwest Florida Water Management District⁠ (opens in a new tab) gives slopes of 5 to 12 percent, with sand and clay lying over limestone. It also says these soils shed a lot of rain as runoff. On a hill, runoff is what moves bare dirt.

Red clay, about a foot down

The federal soil survey puts the courthouse square on Orangeburg loamy sand, 2 to 5 percent slopes. The top is about 7 inches of loamy sand. From about a foot down to 54 inches it is what the survey calls yellowish red sandy clay loam. That is the red clay everybody around Quincy knows.

For a machine, this is good ground. The survey rates it well suited for equipment and for surface site prep, with a moderate hazard of rutting. John Deere lists our 335P at 12,300 pounds and 4.8 psi of ground pressure on its standard tracks. The ridge carries that when it is dry. The catch comes after the sandy top is scraped off. Then the clay is open to the rain. A stripped pad should be graded and covered soon, not left bare through a wet month.

Its neighbor on the survey map, Tifton, has small ironstone pebbles through the topsoil, about 9 percent of it by volume. If your ground is full of small rust colored pebbles, that may be why.

The hillsides

Between the ridge and the creeks the ground gets steep. One survey unit, a mix of Lucy, Orangeburg and Cowarts soils on 15 to 45 percent slopes, covers 13,420 acres of the county. The survey rates the erosion hazard off road there from moderate up to very severe, depending on which of the three soils you are standing on. It also notes that Cowarts holds water on a buried layer for two to four weeks at a time in wet seasons.

So a hillside is where we would rather mulch than push. A blade peels the cover off and leaves loose dirt on a slope. The mulcher leaves the roots in the ground and a mat of chips on top.

The creek bottoms

The single biggest soil unit in Gadsden County is not red clay. It is creek bottom: Pickney, Dorovan and Bibb soils, mapped as frequently flooded, 43,487 acres. On Pickney the survey puts the water table less than 10 inches down for more than eight months of most years. On Bibb it is within 8 inches of the surface for 6 to 11 months.

The survey rates the Dorovan muck poorly suited for equipment and severe for rutting. It rates all three bottom soils severe for windthrow, which means trees tip over easily. Tracks spread a load. They do not float on muck. In the bottoms a machine belongs on the high side, and only when it is dry enough. Tell me what the low end of your land does after a week of rain.

Deep sand

Parts of the county are deep, dry sand. Lakeland sand alone covers 13,847 acres, and the survey calls it excessively drained. It clears easily. It digs badly: the survey rates it very limited for shallow excavations. Our reading of that rating is that the wall of a trench or a cut in loose sand will not stand for long.

Nine of the larger soil units in Gadsden County, by acres in the federal soil survey
Soil unit on the survey mapAcresIn plain words
Pickney, Dorovan and Bibb soils, frequently flooded43,487Creek bottom, wet most of the year
Orangeburg loamy sand, 2 to 5 percent slopes19,401Red clay ridge, gentle. The courthouse square is on it
Orangeburg, Tifton and Norfolk soils, 5 to 8 percent slopes14,003Red clay upland, sloping, pebbly in places
Lakeland sand, 0 to 5 percent slopes13,847Deep dry sand
Lucy, Orangeburg and Cowarts soils, 15 to 45 percent slopes13,420Steep hillside
Dothan and Fuquay soils, 2 to 5 percent slopes13,397Sandy top over a firm, iron rich subsoil
Bonifay and Alpin soils, 0 to 5 percent slopes11,155Deep sand
Rutlege, Bibb and Surrency soils, frequently flooded9,368More creek bottom
Udorthents, reclaimed7,225Reclaimed ground, reshaped by machines
Pickney, Dorovan and Bibb soils, frequently floodedAcres: 43,487

In plain words

Creek bottom, wet most of the year

Orangeburg loamy sand, 2 to 5 percent slopesAcres: 19,401

In plain words

Red clay ridge, gentle. The courthouse square is on it

Orangeburg, Tifton and Norfolk soils, 5 to 8 percent slopesAcres: 14,003

In plain words

Red clay upland, sloping, pebbly in places

Lakeland sand, 0 to 5 percent slopesAcres: 13,847

In plain words

Deep dry sand

Lucy, Orangeburg and Cowarts soils, 15 to 45 percent slopesAcres: 13,420

In plain words

Steep hillside

Dothan and Fuquay soils, 2 to 5 percent slopesAcres: 13,397

In plain words

Sandy top over a firm, iron rich subsoil

Bonifay and Alpin soils, 0 to 5 percent slopesAcres: 11,155

In plain words

Deep sand

Rutlege, Bibb and Surrency soils, frequently floodedAcres: 9,368

In plain words

More creek bottom

Udorthents, reclaimedAcres: 7,225

In plain words

Reclaimed ground, reshaped by machines

Acres come from the USDA soil survey of Gadsden County (survey area FL039). The survey maps soil parcel by parcel, and one tract can run from ridge to bottom.

Where the water goes

Quincy is not on a big river. Its creeks run to the Little River, which empties into the north side of Lake Talquin. The lake is the Ochlockonee River behind a dam built in the 1920s. The water district⁠ (opens in a new tab) gives it about 8,800 acres and 15 miles of length. The Apalachicola River is the far west edge of the county, at Chattahoochee.

Two creeks on the north side of town carry a higher duty than the rest. The water district lists Quincy Creek and Holman Branch as Class I waters, the state class for drinking water supply. The county wrote Quincy Creek into its land code by name. Dirt washing off a cleared slope above it is a real problem, not a housekeeping one.

Ground that has been mined

Quincy is clay country in a second way. The Florida Department of Environmental Protection⁠ (opens in a new tab) says fuller's earth was first found in the United States near Quincy in 1893, and that mining in Gadsden County began in 1895. The soil survey maps 7,225 acres of the county as reclaimed ground, without saying what each acre was before. If part of your tract was mined once, the soil on it is whatever was put back and shaped. Say so before the walk, so nobody plans a job from the look of the ridge next door.

What grows here

Gadsden County's own land code names nine plants it will not protect. That is a good place to start the list of what goes.

The county tree rules⁠ (opens in a new tab) leave these out of tree protection: Chinese privet, Chinese tallow, chinaberry, mimosa, camphor, kudzu, Japanese climbing fern, coral ardisia and nandina. The code calls them invasive and bars planting or selling them in the county. I look at which of them are on your ground.

What belongs on each kind of ground

The soil survey lists the woods that go with each soil. Read it as a list of what is worth keeping.

  • On the red ridge: longleaf, shortleaf and loblolly pine, oaks, hickory and dogwood.
  • On the slopes: the same pines with southern red oak, sweetgum, hickory and flowering dogwood.
  • On the dry sand: turkey oak, blackjack oak, post oak and scattered longleaf pine.
  • In the creek bottoms: sweetgum, red maple, water oak, willow oak, cypress, tupelo and black willow, over titi, greenbrier, wax myrtle and gallberry.

Lake Talquin State Forest, south of town, is the same country left standing. The Florida Forest Service⁠ (opens in a new tab) calls upland pine the largest community in it and points to its slope and ravine forests. Its tree list adds American beech and southern magnolia to the pines and oaks. Trees like those are worth a ribbon on a ravine lot.

Planted pine

A lot of Gadsden County is working forest. The water district⁠ (opens in a new tab) calls forestry a prominent land use across most of this watershed. You can see it in the aerial photo above: straight rows of planted pine beside open fields. Under planted pine, mulching takes the brush and hardwood sprouts and leaves the crop trees. Clearing for forestry has its own exemption in the county tree rules, which matters if you manage timber.

How it comes out, and what a machine cannot do

Privet, vines, briars and saplings are work for the John Deere MK76 mulching head on our 335P. That is forestry mulching: it grinds them where they stand. John Deere rates the head for vegetation up to 8 inches thick. A tree past that is not mulcher work. It stays, or it comes down as land clearing with the excavator.

A mulcher cuts the top and leaves the root, and some plants come back from the root. UF/IFAS⁠ (opens in a new tab) is blunt about the worst of them. It says cogongrass, Chinese tallow, Chinese privet and Japanese climbing fern cannot be controlled by fire alone. It says cogongrass always takes repeated herbicide to wipe out. And it warns that heavy equipment can spread these plants, so machines should be cleaned before they leave an infested site. If you know of a patch, show us on the walk.

For a plant you cannot name, the UF/IFAS Extension office for Gadsden County⁠ (opens in a new tab) is on West Jefferson Street in Quincy, at (850) 875-7255.

Tortoise burrows

The Florida Forest Service says gopher tortoises live throughout Lake Talquin State Forest. A burrow changes where a machine may go, so point out any you know of on your land. The 25 foot rule is in the rules section below.

Rules and permits in Gadsden County

First question on every Quincy job: is the parcel inside the city limits or in unincorporated Gadsden County? The rule books differ. A Quincy mailing address does not settle it, and the line has moved. The Census Bureau⁠ (opens in a new tab) measured the city at 7.91 square miles in 2010 and 11.65 in 2020.

In the county: a $100 Tree Removal and Clearing Permit

Gadsden County has a Tree Removal and Clearing Permit application with a $100 fee. It asks for a site drawing with the limits of clearing, the trees to come out and every protected tree, which the form sets at 20 inches thick or more. The drawing shows barricades around protected trees at the full dripline, and the approved permit is posted on the site. If someone other than the owner applies, the form asks for an Authorization to Represent. Check with the Gadsden County Planning Division, (850) 875-8663, whether your job needs one.

In the county: no clearing ahead of a development approval

On land headed for development, the county code allows only one thing before approval: underbrushing of growth under 4 inches thick, so a surveyor can work. Clearing ahead of development takes a letter of permission from the Planning Department, an approved clearing or landscaping plan, and barricades and erosion control approved first. The county also names certain roads corridor roads. In the setback strip along one, and in wetlands and their buffers, the code prohibits clearing ahead of a development order. Ask Planning whether your road is one of them.

In the county: who is exempt

The county tree rules exempt the placing of one detached single family home on a piece of property, and waive tree protection for its driveway. Forestry work is exempt as well, and so are the invasive plants the code lists. After a hurricane or other disaster, the County Manager may suspend the tree protection standards. An exemption from the tree rules is not an exemption from wetland, burn or building rules.

In the county: the root zone and the price of ignoring it

The county figures the protection zone of a protected tree at one foot of radius for every inch of trunk thickness. The code asks for a post and rail barrier set at least 10 feet beyond the drip line, and no tractor or heavy machine may work or park inside it. Protected trees removed without approval are replaced at one inch for every two inches removed, or paid for at $125 per inch of thickness.

In the county: stay back from the water

The county code allows no development within 50 feet of any perennial river, stream, creek, lake or pond. At Quincy Creek the distance is 100 feet from the creek bed. Another line of the same chapter keeps septic tanks 100 feet from those waters and from wetlands, and out of floodplains. The code also asks each home lot under development for a silt fence on the downhill side and a mud barrier of railroad stone, 2 to 4 inches deep, at the driveway.

In the county: a letter when a contractor pulls the permit

The Gadsden County Building Department says any permit pulled by a contractor needs a Letter of Authorization from the property owner, filled out along with the permit. It also says permits are not issued after 4 p.m.

Inside the city: approval first, and notice before power equipment

The city code makes it a condition of every environmental management permit that clearing waits for an approved building foundation permit or a final site plan. One opening is written in: a limited path cleared for soil borings and surveys. If that takes power equipment, written notice goes to the building official at least 24 hours ahead, with the site, the limits of the clearing and who is doing it. Check with City of Quincy Building and Planning, through City Hall at (850) 618-0020, how this applies to your lot.

Inside the city: erosion control first, and 30 days

The city code says no clearing, grading, cutting or filling may start until erosion and sediment controls are in. They go between the work and the neighbors, the water and the wetlands. Ground that stays cleared for over 30 days with no work going on has to be stabilized. A single home on its own parcel is exempt from the stormwater section of the code. It is not exempt from controlling erosion.

Inside the city: flood hazard areas

In a flood hazard area the city requires a development permit before any development starts, and the code counts filling, grading and excavating as development. To check your parcel, ask City of Quincy Building and Planning or look it up at the FEMA Flood Map Service Center.

Inside the city: trees

Ask City of Quincy Building and Planning before a big tree comes out. The city code leans toward keeping trees. New development other than a single home, a two family home or active farming needs a landscape plan that shows the trees to be preserved. And the code allows a variance in a driveway design when it would save trees 12 inches thick or more.

Inside the city: the historic district

The nine blocks around the courthouse square are part of a historic district listed on the National Register in 1978. Inside the district the city code asks for a certificate of appropriateness before other permits, demolition included. The exception is a demolition the building official certifies is needed for public safety. A teardown near the square starts at City Hall, not with us.

Inside the city: working hours and tall weeds

The city noise rule bars running construction or demolition equipment between 7 p.m. and 7 a.m. On Sunday the window is 11 a.m. to 7 p.m. The nuisance rule covers grass or weeds over 18 inches tall that are a menace to public health and safety, and vacant land that is not kept clean and safe.

Demolition anywhere in Florida

Florida law makes it unlawful to demolish a building without a permit from the enforcing agency. For a parcel in the county that is the Gadsden County Building Department, (850) 875-8665. Inside the city, ask Building and Planning.

Burning the pile

Every land clearing pile burn in Florida needs an authorization from the Florida Forest Service. So does any pile more than 8 feet across. A pile from clearing a home site must sit 300 feet from any occupied building that is not the landowner's, 100 feet from a paved public road and 50 feet from woods or brush. Piles from other clearing, such as a subdivision or a commercial site, need 1,000 feet from occupied buildings. The office for Gadsden County is the Tallahassee Forestry Center, (850) 681-5951. Inside the city limits, ask the Quincy Fire Department, (850) 875-7315, as well.

Creek bottoms and wet ground

In Northwest Florida the state Environmental Resource Permit covers dredge and fill work in freshwater wetlands, isolated ones included. Around Quincy the wet ground is the creek bottoms, and the soil survey maps them as frequently flooded. Whether a low spot is a wetland is not our call or yours. Ask the Northwest Florida Water Management District before anything is cleared there.

Gopher tortoise burrows: 25 feet

Gopher tortoises and their burrows are protected by Florida law. The Florida Fish and Wildlife Conservation Commission counts any work within 25 feet of a burrow as a disturbance. A relocation permit has to be in hand before a burrow is disturbed. If all the work stays 25 feet away, the commission says a permit may not be needed.

A dangerous tree by a house

Florida Statute 163.045 says a local government may not require a permit to remove a tree on residential property when the owner holds documentation from an arborist certified by the International Society of Arboriculture, or from a Florida licensed landscape architect, that the tree poses an unacceptable risk to people or property. Get the paper first.

Before anything digs

Florida law requires notice through Sunshine 811 at least two full business days before any excavation or demolition. Reach it at 811 or (800) 432-4770.

This is not legal advice. The office named gives the answer for your parcel.

Who to call

Distances around Gadsden County

Our yard is in Quincy, so there is no drive to speak of. From the courthouse square it is about 6 road miles to Gretna, 11 to Greensboro and Midway, 12 to Havana and 20 to Chattahoochee.

All of Gadsden County keeps Eastern Time. Sneads and Marianna, across the Apalachicola River, run an hour behind us.

Equipment delivery is free inside about 30 road miles of Quincy, which covers every Gadsden County town named here. Past that the instant quote adds a delivery line: about $10 for each further road mile for one machine, and one and a half times that when two machines have to come. These are estimates. I confirm the delivery line, with the price, when I walk the ground.

How distance changes a price

Places we cover around Quincy

Gretna, Greensboro, Havana, Midway, Chattahoochee, Wetumpka, Mount Pleasant, Sawdust, Santa Clara, Douglas City, Littman, Lake Talquin.

Questions about Quincy

Do I need a permit to clear my land in Quincy?

It depends on where the parcel is. Outside the city, Gadsden County has a Tree Removal and Clearing Permit with a $100 fee, and one single family home is exempt from its tree rules. Inside the city, clearing is tied to a building permit or site plan. Call County Planning at (850) 875-8663 or City Hall at (850) 618-0020 first.

Can the brush be burned on site?

Sometimes, on land with room. Every land clearing pile burn needs an authorization from the Florida Forest Service⁠ (opens in a new tab), and a home site pile has to sit 300 feet from any occupied building that is not yours. Inside the city, ask the Quincy Fire Department at (850) 875-7315 first. On a tight lot I mulch the brush or haul it off.

Is there a delivery charge when the job is right here in Quincy?

No. Equipment delivery is free inside about 30 road miles of Quincy, and that takes in Gretna, Greensboro, Havana, Midway and Chattahoochee too. The job minimum is $2,000 wherever the land is.

My land is red clay on a hill. When is the best time to clear it?

When it is dry. The ridge soil under Quincy carries equipment well, but it can rut. On a slope I would rather mulch and leave the chips than scrape to bare clay. Creek bottoms stay wet most of the year, so tell me what your low ground does after rain.

More questions
The city sent me a notice about an overgrown lot. Can you cut it?

Yes, if the lot is big enough to be worth it. The Massey Ferguson tractor and batwing cutter handle open ground, and the mulcher handles a lot gone to brush and saplings. Our job minimum is $2,000, so for one small lot that only needs mowing, a lawn service will do it for less.

There is an old tobacco barn or trailer on the place. Can you take it down?

Yes. Demolition is work for the John Deere 60P excavator with its thumb, and the debris is loaded and hauled off. Florida law asks for a building permit before a building comes down, so ask the Gadsden County Building Department, or the city inside the limits, before you pick a date.

How does the estimate visit work in Quincy?

Start with the instant quote, then pick a time, Monday to Friday. I come out at that time, free, walk it with you and flag what stays. For a Quincy parcel, have four answers ready: city or county, where the low wet ground is, whether any of it was ever mined, and which trees you want kept.

Got land around Quincy?

Draw it on the map and see a price range in about two minutes. You talk to nobody until you want to.

Rather talk it through? Call or text

CallTextPrice range